Sunday, November 30, 2008

Work completed in October and November

Without a scheduled workday, the building and grounds has been kept up a little at a time. If I missed anything, let me know. A few more things have stopped working since October, but overall, I think we are just keeping up with the building.

Outside:

  • Pull out last nine stumps from the bushes ( James, Emily, Aaron, Joshua )
  • Install small lights that shine on the front walkways ( Kevin )
  • Replace outdoor lights and set timers ( Scott, Gadis, Kevin Thomas [ after Gayle highlighted the darkness ] )
  • Scrape grass out of parking lot ( James, Emily, Aaron and Joshua got this started [ lots more to do ] )
  • Patch up holes in the downspout tiles ( Kevin )
  • Rehang the gutter over the sidewalk ( Kevin )

Sanctuary:

  • Move the pews back into the sanctuary ( Kevin and Travis )
  • Get ceiling fan and new light in foyer working with switch ( Scott )

Education Wing:
  • Reglue loose step covers in stairwells ( Kevin Thomas )