Without a scheduled workday, the building and grounds has been kept up a little at a time. If I missed anything, let me know. A few more things have stopped working since October, but overall, I think we are just keeping up with the building.
Outside:
- Pull out last nine stumps from the bushes ( James, Emily, Aaron, Joshua )
- Install small lights that shine on the front walkways ( Kevin )
- Replace outdoor lights and set timers ( Scott, Gadis, Kevin Thomas [ after Gayle highlighted the darkness ] )
- Scrape grass out of parking lot ( James, Emily, Aaron and Joshua got this started [ lots more to do ] )
- Patch up holes in the downspout tiles ( Kevin )
- Rehang the gutter over the sidewalk ( Kevin )
Sanctuary:
- Move the pews back into the sanctuary ( Kevin and Travis )
- Get ceiling fan and new light in foyer working with switch ( Scott )
Education Wing:
- Reglue loose step covers in stairwells ( Kevin Thomas )
1 comment:
Don't forget Joshua!! He helped scrape grass and pull stumps as well!
Carol
Post a Comment