Saturday, October 10, 2009

Work List for Fall and Winter

Outside:
  • Two new downspouts in corner that drain directly to the water retention basin instead of the basement.
  • Pull weeds and cut back the perennials in the front of the church
  • Trim hedges in front of the parking lot
  • Plant tree (or trees) and spread sand and rocks at the bottom of the building
  • Check security light function and timings

Hiring a plumber for the following items:
  • Repair baptistry heater ( water heater or jacuzzi heater instead of current system)
  • Repair water fountain near the community library
Foyer:
  • Install silver track lighting above the community library
  • Patch over the holes where the decorative fountain was and repaint
  • Talk with Josh about ideas for the community library

Sanctuary:
  • Redo the lighting on the stage ( direction, amount, appearance )
  • Build a wide canvass for projection ( alternatively, replace with multiple, smaller LCD monitors closer to the people )
  • Install projector and monitor in a more attractive and hidden manner
  • Reorient sound board
  • Prepare ceiling for painting
  • Design and build new altar in front of stage ( no more wires, cables, cords )
  • Blend baptistry design with the altar ( stones, brook, river )
  • Replace doors between sanctuary and foyer to open things up ( taller doors )

Fellowship Hall:
  • Waterproof the closet in front ( tear down wall to make more usable?)
  • Replace kitchen countertop
  • Repair left kitchen sink ( it leaks )
  • Replace ceiling tiles
  • Remodel both bath rooms ( new sinks, cabinets, exhaust fans, lights )
  • Remove all the multi-line business phone infrastructure
  • Repair or remove ceiling tiles in fan / storage / sink rooms
  • Insulate (plug) the unused dryer vent

Education Wing:
  • Cabinets and counter tops
  • Six switch light panel ( or dry wall over portion of junction box )
  • Replace fluorescent fixtures, lights and covers as necessary
  • Install video equipment securely
  • Finish mudding the Sound Closet
  • Replace carpet in all the offices, closets
  • Paint all the offices, closets, stairways, hallways ( almost done )

Other things that can be done ( wish list after mortgage is paid off ):

  • HVAC ( Install air return for the sanctuary )
  • Arrange for exterminator to protect building from termites
  • Install thermostats that are not adjustable by occupants
  • Basketball goal for community
  • Repave the parking lot
  • Sign

No comments: