Saturday, April 21, 2007

Church Work Day on May 12

Things that we can do:

  • A few windows in rear of building at dangerous point of falling out (LCF suggested sliding windows with screens instead of crank windows or fixed windows)
  • Need to repair drywall and paint in entry way.
  • Plumber: Repair the outside faucet in the rear of the building
  • Plumber: Repair the leaking faucet in the upstairs men's restroom
  • Plumber: Repair baptistry heater ( water heater or jacuzzi heater instead of current system)
  • HVAC ( Install air return for the sanctuary, ventilation for sound room for equipment, workers and most importantly the thermostat )
  • Install New Lighting: Sanctuary and foyer
  • Remove brick mail box - replace with a normal mailbox in one of the community's cluster of mail boxes. Safer for drivers pulling out of driveway, elimination of an eye-sore. (need volunteer)
  • Need to rebuild shed or tear it down ( need communication with users and neighbors )
  • Need to replace ceiling tiles in basement
  • Need to replace many fluorescent lights throughout the building ( Men's restroom in basement has no lights at all )
  • Finish mudding and painting in the CAT Closet
  • Install cabinets and counter tops in the youth room
  • Minor carpentry finish work in the youth room
  • Repair and reinforce our neighbor's fence
  • Edge the sidewalks
  • Talk with city about picking up herbies in the back instead of by the street
  • Mow the tree sanctuary

No comments: