Saturday, April 28, 2007

Work List after Church Building Walk-Through

May 12 Work Day:

The work day will be focused on outdoor spring clean up. Bring a shovel, mower, weed eater, hedge trimmers, sledge hammer, gloves for weeding and mulching, lopping shears and other outdoor tools.

  • Remove brick mail box - replace with a normal mailbox in one of the community's cluster of mail boxes. Safer for drivers pulling out of driveway, elimination of an eye-sore. (need volunteer)
  • Repair and reinforce our neighbor's fence
  • Edge the sidewalks ( Already started )
  • Mow the tree sanctuary
  • Spread mulch
  • Remove pew in hallway
  • Finish installation of lights in santuary


Windows to be done in Summer:
James and Kevin are collecting quotes for windows, work to be done in May or June. A few windows in rear of building at dangerous point of falling out (LCF suggested sliding windows with screens instead of crank windows or fixed windows)

  • 28 Large windows ( 67 x 23.5 )
  • 6 Medium windows ( 23.5 x 31.75 )
  • 7 Small windows ( 31 x 19.5 )


Hiring a plumber for the following items:
  • Repair the outside faucet in the rear of the building
  • Repair the leaking faucet in the upstairs men's restroom
  • Repair baptistry heater ( water heater or jacuzzi heater instead of current system)
  • Install valve on toilet in women's restroom in basement of education wing
  • Repair broken toilet in women's restroom upstairs in education wing

South Lexington group will be doing on May 3, May 10 :

  • Repair drywall and paint in entry way.
  • Install new lighting in foyer
  • Install new lighting in the sanctuary
  • Finish mudding and painting in the CAT Closet

Finish the youth room project:
  • Cabinets and counter tops in the youth room
  • Trim along top of wallboard
  • Baseboard
  • Six switch light panel
  • Cover for unused wires above the door
  • Paint hallway
  • Install video equipment securely

Other things that can be done:

  • HVAC ( Install air return for the sanctuary, ventilation for sound room for equipment, workers and most importantly the thermostat )
  • Arrange for exterminator to protect church from termites
  • Hire stump grinder for two stumps in front yard near the neighbor's yard
  • Rebuild shed or tear it down ( need communication with users and neighbors )
  • Replace ceiling tiles in basement
  • Install thermostats that are not adjustable by occupants
  • Replace many fluorescent lights throughout the building ( Men's restroom in basement has no lights at all )
  • Talk with city about picking up herbies in the back instead of by the street

No comments: