Saturday, October 04, 2008

Work List for October Work Days

Winterizing and cleaning up this year should be relatively simple, I've only heard a few complaints about stuff that needs to be done.

Outside:

  • Pull out last nine stumps from the bushes ( shovels, pick ax )
  • Fill all 35 stump holes with dirt and then plant grass ( shovels, dirt )
  • Mow the tree sanctuary ( weed eaters, hand mowers, no grass over 12" )
  • Install small lights that shine on the front walkways
  • Replace outdoor lights and set timers
  • Scrape grass out of parking lot ( good TC IB community service hours )
  • Patch up holes in the downspout tiles ( else we will have more water in basement )
  • Call city to turn in some extra herbies and rosies.
  • Brainstorm on new ideas for the front that engages the community
    • Community Garden
    • Community Shelter with picnic tables and grills
    • Basketball court
    • Sand Volleyball



Hiring a plumber for the following items:
  • Repair the outside faucet in the rear of the building
  • Repair baptistry heater ( water heater or jacuzzi heater instead of current system)

Sanctuary:

  • Redo the lighting on the stage ( direction, amount, appearance )
  • Build a wide canvass for projection
  • Move the pews back into the sanctuary
  • Put up the light in front of sanctuary ( some members need symmetry )
  • Install projector and monitor in a more attractive and hidden manner
  • Reorient sound board
  • Repair ceiling tape and prepare for painting
  • Design and build new altar in front of stage ( no more wires, cables, cords )
  • Blend baptistry design with the altar ( stones, brook, river )
  • Replace doors between sanctuary and foyer to open things up ( taller doors )

Fellowship Hall:
  • Waterproof the closet in front ( tear down wall to make more usable?)
  • Replace kitchen countertop
  • Replace fluorescent fixtures, lights, and covers as necessary
  • Replace ceiling tiles
  • Remodel both bath rooms ( new sinks, cabinets, exhaust fans, lights )

Education Wing:
  • Cabinets and counter tops
  • Six switch light panel
  • Replace fluorescent fixtures, lights and covers as necessary
  • Reglue loose step covers in stairwells
  • Stop emergency heat from kicking on when it gets too hot
  • Install video equipment securely
  • Finish mudding the Sound Closet
  • Remodel Mike's office
  • Replace carpet in all the offices, closets
  • Paint all the offices, closets, stairways, hallways

Other things that can be done ( wish list ):

  • HVAC ( Install air return for the sanctuary )
  • Arrange for exterminator to protect building from termites
  • Install thermostats that are not adjustable by occupants
  • Grade the parking lot for better water drainage before repaving

No comments: